| snippet:
|
The County's Trails Master Servicing Study required a layer to represent the existing and proposed trails within the county. |
| summary:
|
The County's Trails Master Servicing Study required a layer to represent the existing and proposed trails within the county. |
| extent:
|
[[-80.1715863867993,42.7826752871166],[-79.431431759708,43.1088600166557]] |
| accessInformation:
|
Originally built by the Engineering Services Department, Doug Reimer. Currently maintained by the Planning Department, Matt Davis. |
| thumbnail:
|
thumbnail/thumbnail.png |
| maxScale:
|
1.7976931348623157E308 |
| typeKeywords:
|
["Data","Service","Map Service","ArcGIS Server"] |
| description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>This data represents the existing and proposed trails with content providing names of trails and any acceptable useage.</SPAN></P></DIV></DIV></DIV> |
| licenseInfo:
|
|
| catalogPath:
|
|
| title:
|
HaldimandTrails |
| type:
|
Map Service |
| url:
|
|
| tags:
|
["Trails","walkways","biking","bike","hiking","hike."] |
| culture:
|
en-CA |
| name:
|
HaldimandTrails |
| guid:
|
63FC154C-9171-4E9C-91E0-82F7FA08EBE6 |
| minScale:
|
0 |
| spatialReference:
|
NAD_1983_UTM_Zone_17N |